游客
题文

The total cost of this project will be more than ________ that of the one last century, which is expected to cost below US a score billion.

A.twice as many as B.as much as twice C.twice than D.double
科目 英语   题型 单选题   难度 中等
知识点: 数词+单位名称
登录免费查看答案和解析
相关试题

.A man may be known ______- he keeps.

A.by the man B.by the woman
C.by the company D.the firm

The advertisement ____ always ____ people’s attention.

A.in big print; pays B.in big print; draws
C.with big print; pays D.with big print; catches

We did the work ______, and as a result, we were taken in.

A.to their satisfaction B.to their satisfied
C.satisfied D.to their satisfy

You may find the answer _____ page 25.

A.at the top of B.at the top
C.on the top of D.on the top

-- __________office equipment been fixed yet?
--- Yes, we have everything now.

A.Have B.Has C.Are D.Is

Copyright ©2020-2025 优题课 youtike.com 版权所有

粤ICP备20024846号